Solar Label Placement Guide:
Solar Label Placement Guide: NEC 2020 & NEC 2026
Where each label goes, what it has to say, and which code section the inspector will cite. Pick your code cycle and system type and the diagram and label list update to match.
Where the labels go
Tap a numbered location to jump to its labels and part numbers. Your layout will differ: equipment may be combined, indoors, or on a separate structure. The label follows the equipment.
Label schedule
| # | Label | Code section | Where it goes | Format | Part no. |
|---|
Labels by location
NEC 2020 vs. NEC 2026, side by side
Most of the difference is where the rule lives, not what the label says. Highlighted rows are the ones where the label itself, or whether you need it, changed.
| Label | NEC 2020 | NEC 2026 | What changed |
|---|
Field tips that prevent a red tag
Confirm the adopted cycle first
Label to the edition your AHJ enforces on the permit date, including local amendments. Some jurisdictions add fire-code or utility placards on top of the NEC.
Match the plan set
Voltage and current values on field-filled labels must match the stamped plans. Under NEC 2026 the DC voltage may be rounded up, which lets you stock standard values.
Durability is part of the rule
Field-applied hazard markings must be permanent, suited to the environment, and not handwritten (110.21(B)). Outdoors, that means UV-stable material or engraved placards.
Label what the firefighter sees
The rapid shutdown placard and the power source directory belong at the service equipment, not hidden inside a dead front or in the garage with the inverter.
Need the labels for this job?
NEC-compliant labels and engraved placards, printed in Riverside, CA. Send us your plan set and we will build the kit.
This guide is a general reference to NFPA 70 (National Electrical Code) marking requirements for PV and energy storage systems and is not a substitute for the code text, your engineered plans, or your Authority Having Jurisdiction. Section numbers marked "confirm" should be checked against your copy of the code. Requirements vary by system design and local amendment. Questions: japji@getsolarlabels.com · 951-800-8599.
© 2026 Get Solar Labels. All rights reserved. This guide may not be reproduced or republished without written permission.